国产精品久久二区,www.男人的天堂,好看的毛片网站,白嫩少妇激情无码,欧美成人免费全部观看天天性色,天天激情综合,国产一区二区三区91

 
Location:Home >>News >>Questions

Post welding inspection of box columns in steel structure processing

Update time:2020/08/07 18:06:08  Click:  
Post welding inspection of box columns in steel structure processing.
1. Appearance and dimensional inspection.
2 Ultrasonic testing
2.1 Design requirements: Full penetration welds should undergo ultrasonic testing in accordance with GB11345 standard.
2.2 The level of welds shall be in accordance with the design specifications.
2.3 The first level weld seam should be 100% inspected, and the qualification standards are: B-level standard, and II-level qualified; The inspection ratio for second level welds is 20%, and the qualification standards are B level standard and III level qualified.
------分隔線----------------------------